My Growth History

From 1958 to Now

In 1958, Fujian Water Power Engineering Installation Team was established, and was renamed again and again as Fujian Electric Installation Engineering Department, Fujian Mechanical and Electric Installation Engineering Company, and Fujian Electric Power Engineering Company.

In June 29, 1989, According to professional division, Fujian Electric Power Engineering Company was divided into Fujian First Electric Power Engineering Company and Fujian Second Electric Power Engineering Company.

In September 29, 2011, Power Construction Corporation of China was established. Fujian First Electric Power Engineering Company was the part of Power Construction Corporation of China.

In September 4, 2012, Fujian Electric Power Engineering Contracting Company became the subsidiary company of Fujian First Electric Power Engineering Company.

In November 17, 2014, Fujian First Electric Power Engineering Company became the subsidiary company of Shanghai Electric Power Engineering Company.

In December 22, 2017, Fujian First Electric Power Engineering Company was successfully rebuilt, and it was named as PowerChina Fujian Engineering Co., LTD.

My Studies

Kills & Knowledge

In the competitive era, we cannot survive without skills. Therefore, I insisted on “live and learn.” I have been through learning and practicing to train myself for many years. Life will reward your best effort. I have won Class-A qualification of EPC contract in electric power project from The State of National Grid, qualification of housing construction, and qualification of municipal public work. I have the capacity to undertake various types of electric construction projects, including thermal power plants, wind power, solar power, nuclear power and auxiliary production facilities. Also I am able to undertake the various voltage grade of transmission line projects, power substation projects and civil construction projects.

 

For the sixty years, I have businesses in nineteen provinces throughout the world. I have built nearly 200 units of power generators, had installed capacity exceeded 30 million kilowatts, and completed more than 20000 km of transmission line projects.

Thermal Power System

Exceeding 30,000,000.00MW

I am a major general contractor for construction of regular thermal power plants in China, with its core technologies and excellent management & control capabilities on projects, it has undertaken and constructed a lot of large-scale projects in many provinces of China and in international markets like, the Philippines, Bangladesh, etc. with installed capacity exceeding 30,000,000.00MW.

2 x 1000 MW Ultra-super Critical Coal-fired Generator Unit Construction Project of Fujian Shishi Hongshan Thermal Power Plant

2 x 660 MW Ultra-super Critical Unit Construction Project of Huaneng Fuzhou Power Plant, Phase III

2 x 600 MW Unit Construction Project of Datang Ningde Power Plant, Phase I

Power Transmission Lines

over 20,000km

I possess construction technologies for transmission and transformation projects of various voltage classes and have successfully developed and applied multiple wiring technologies of power-on and over-live-wires construction. I am a foundation construction master of rocky and soft ground, and have accumulated technologies tower erection, tension stringing and large-section conductor laying of different combinations. Over the past sixty years, I as undertaken more than 300 transmission and transformation projects of no less than 110 KV with the aggregate length of transmission line to be over 20,000km. The Project undertaken and constructed by me currently in Brazil and the Philippines cover all voltage classes of the country. And now, I have undertaken the expansion, re-construction and upgrading of national grid systems in Bangladesh.

New Energy

Wind Power, Solar Power, Environmental Protection

I have made great achievements in new energy construction such as wind power, photovoltaic, garbage, distributed energy sources and biomass power generation. In China, I have participated in the construction of the wind power project with the largest unit capacity (3.45 MW) on Mainland, the offshore wind power project with the largest unit capacity (5 MW) commercially operated, the first offshore wind power project on sourth-earstern coast, the largest terrestrial photovoltaic power plant, the wind power project of Fujian, the first waste incineration plant and the first natural-gas distributed energy source station in Fujian Province, making a lot of records.

House Building and Infrastructures

Economic & Social Leap

I take the industrial orientation of China and the great opportunities of Fujian economic and social leap, exploiting its qualification advantages of building and municipal general construction to contribute to emerging fields such as municipal roads, housing and building, rail transit, integrated pipeline corridor, water environment treatment, etc. and has reached a strategic consensus with regard to the construction of Fuzhou Sponge City and Binhai New Area with Fuzhou government.

Overhaul Operation and Maintenance, and Test & Commissioning

“Able and Excels in Problem-solving”

With 60 years of installation experience and technology, I have set up south maintenance base in Shihi of Fujian Province to provide professional rush repair, long-term maintenance, overhaul and technical renovation service for the power plant after completion. The subordinate test & commissioning and performance test of the large and medium-sized power station units. The professional and quality services have been widely recognized by customers, and have won the company the banner of “Able and Excels in Problem-solving”, as well as honors including “first-class contract”, “excellent enterprise of professional overhaul” and “excellent maintenance contractor”.

Production Equipment Maintenance Project of Fujian Shishi Hongshan Thermal Power Plant Unit No.4 (1,000MW)

Social Responsibilities

Volunteer

While committed to providing comprehensive and high quality service for power investment customers at home and abroad, I actively repays society, pursues harmonious development of enterprises and the environment, boosts social public welfare undertakings and actively integrates into the cultural life of the project site, to build the bridge of friendship and to demonstrate a responsible, courageous and committed corporate image with practical action.

My Hornor

Achievement

I am an enterprise with the titles of National Outstanding Construction Enterprise in Electric Power Construction, National Model Credit Enterprise in Electric Power Construction and National Credit Enterprise in Fulfilling Contractors. Besides that, I am awarded as “National Model Employees’ Homes” by the All-China Federation of Trade Union. The projects constructed by me have won several awards, including the “Luban Prize” for Construction Project for one time, National Quality Project Award for nine times, China Electric Power Quality Project Award for eleven times, the Bechtel Global Outstanding Project Award for one time, the “Min River Cup Quality Project Award” of Fujian Province for three times, the Outstanding Overseas Project Award of the State Grid for three times and the National Outstanding Welding Project Award for six times.

Thank you

Posted in FEPEC News.

11 Comments

  1. Its like you read my mind! You appear to know a lot about this, like you wrote the book in it or something. I think that you could do with a few pics to drive the message home a bit, but other than that, this is magnificent blog. A fantastic read. I will certainly be back.

  2. Simply desire to say your article is as astounding.
    The clarity in your post is simply excellent and i could assume you are an expert on this subject.
    Fine with your permission allow me to grab
    your RSS feed to keep updated with forthcoming post.
    Thanks a million and please keep up the enjoyable work.

  3. Hello everyone, it’s my first pay a quick visit at this website, and article
    is in fact fruitful in favor of me, keep up posting
    such content.

  4. Hi, you have post here a very useful information for everyone who looking to learn more information on this topic. I read it with most enjoyment and believe that everyone can apply it for their own use. Thank you for useful post. Looking to read more from you.

  5. You can certainly see your skills in the work you write. The world
    hopes for more passionate writers such as you who aren’t afraid to mention how they believe.
    At all times follow your heart.

Leave a Reply

Your email address will not be published. Required fields are marked *